Call us: 323-318-0428
Home About Services Blog Contact Free Consultation
Serving All of Los Angeles, CA

Get Your Express Permit Approved in 5 Days

Why wait 3 months for a regular permit? Express permits are approved in as few as 5 business days. Expert LADBS guidance for Los Angeles homeowners, contractors, and businesses.

Call us: 323-318-0428
Los Angeles permit expert reviewing construction blueprints
2,500+
Permits Approved
98%
Approval Rate
5 Days
Express Processing
15+ Years
LA Experience
What Are Express Permits?

5 Days vs 3 Months � The Express Advantage

Express Permits are issued by LADBS for routine, non-structural work that doesn't require a formal plan review. While regular permits can take up to 3 months, express permits are typically approved within 5 business days.

5 Days

Express Permit

No plan check required. Fast-tracked for qualifying non-structural projects.

~3 Months

Regular Permit

Requires formal plan check review. Typical for structural and complex projects.

Our Services

Your Path to a Fast Permit Starts Here

We handle every type of express permit available through LADBS, guiding Los Angeles homeowners and contractors from qualification to approval in just 5 days.

Qualification Check

Do You Qualify for an Express Permit?

Most routine residential and commercial projects qualify. Get approved in 5 days instead of waiting 3 months. Key criteria:

  • Non-structural work (no load-bearing wall changes)
  • Replacement with same size and type materials
  • Projects within the 10% rule threshold
  • Residential remodels without expanding footprint
  • HVAC systems under 500,000 BTU capacity
  • Electrical panels up to 400 amps
  • Solar installations up to 10 kW
  • Plumbing with 10 or fewer gas outlets
Check My Qualification

Projects That Do NOT Qualify

These require a regular plan check permit (~3 months):

  • Structural modifications (load-bearing walls)
  • Building additions or expansions
  • New construction projects
  • Projects exceeding the 10% rule
  • Work in historic preservation zones
  • Commercial fire life safety review projects
Why Choose Us

Avoid 3-Month Delays with Expert LA Permit Help

Approved in 5 Days

No lengthy plan check process. Get your express permit approved in as few as 5 business days � compared to 3 months for regular permits.

Avoid Costly Delays

Regular permits take up to 3 months. Our expert team fast-tracks your express permit, saving LA contractors time and money.

LADBS Expertise

Deep familiarity with Los Angeles Department of Building and Safety requirements across Van Nuys, West LA, San Pedro, and South LA offices.

Local Trust

Serving Los Angeles homeowners, contractors, and businesses for over 15 years with a 98% first-time approval rate.

Reviews

Trusted by LA Homeowners & Contractors

★★★★★ 4.9 / 5.0 (127 reviews)
★★★★★

"Got my kitchen remodel permit approved in just 5 days! The team knew exactly what LADBS needed. Highly recommend for any LA homeowner."

MR

Maria Rodriguez

Homeowner, Van Nuys

★★★★★

"As a contractor handling multiple LA projects, they're my go-to for express permits. 5-day turnaround vs months of waiting. Reliable and efficient."

DC

David Chen

Contractor, West LA

★★★★★

"I flip properties across LA and these guys save me thousands in delays. Express permits in 5 days instead of 3 months for regular. Game changer."

JM

James Mitchell

Investor, Downtown LA

Service Areas

Serving All of Los Angeles

Our permit experts serve every neighborhood and community in the City of Los Angeles and surrounding areas.

Los Angeles Van Nuys West LA San Pedro South LA Hollywood Downtown LA San Fernando Valley Eagle Rock Silver Lake
FAQ

Frequently Asked Questions About LA Permits

An Express Permit is a building permit issued by LADBS that doesn't require a plan check. These permits are for routine, non-structural work and can be approved in as few as 5 business days � compared to 3 months for regular plan check permits.
Express Permits are typically approved within 5 business days at LADBS. Regular permits that require plan check review can take up to 3 months. Express permits bypass the plan check process entirely for qualifying projects, saving you significant time.
The 10% rule allows certain modifications that don't exceed 10% of the existing system or structure. For example, you can modify up to 10% of existing electrical circuits or plumbing fixtures without triggering a full plan check at LADBS.
Los Angeles homeowners can apply for Express Permits themselves for certain projects. However, working with a local permit service like ours ensures your application is complete, accurate, and processed efficiently at LADBS.
We serve all of Los Angeles including Van Nuys, West LA, San Pedro, South LA, Hollywood, Downtown LA, San Fernando Valley, and surrounding areas. Our team is familiar with all LADBS offices and their specific requirements.
Express permits are approved in approximately 5 business days without plan check review � ideal for non-structural, qualifying projects. Regular permits require formal plan check review and typically take up to 3 months. We help you determine which path is right for your project.

Ready to Get Your LA Permit in 5 Days?

Don't wait 3 months for a regular permit. Contact us today for a free consultation and find out if your project qualifies for express processing.